Sadbhav Futuretech IPO Details
Sadbhav Futuretech Limited filed its draft red herring prospectus with SEBI on 2 Apr 2026 and Sebi Approval received on 28 Aug 2026. Price band, lot size and issue dates are announced only after SEBI observations and the RHP filing.
Last updated
- Stage
- SEBI Approved
- DRHP filed
- 2 Apr 2026
- SEBI Approval
- 28 Aug 2026
- Issue size
- —
- Board
- Mainboard
- Price band
- TBA
Sadbhav Futuretech IPO status
Sadbhav Futuretech Limited filed its draft red herring prospectus (DRHP) with SEBI on and SEBI Approval received on . The issue can open only after SEBI issues its observations and the company files the RHP with the price band.
| DRHP filed | 2 Apr 2026 |
|---|---|
| Days since filing | 235 |
| SEBI observation | 28 Aug 2026 |
| Price band | TBA |
| Issue dates | TBA |
Share reservation by category
| Category | Shares Details |
|---|---|
| Qualified Institutions | Not More Than 50% of the Net Issue |
| Retail Investors | Not Less Than 35% of the Net Issue |
| Non-Institutional | Not Less Than 15% of the Net Issue |
Sadbhav Futuretech Limited financials
Between 31 Mar 2024 and 31 Mar 2025, Income rose from ₹133.76 Cr to ₹302.77 Cr, and profit after tax rose from ₹7.69 Cr to ₹30.8 Cr. The PAT margin for 31 Mar 2025 was 10.17%.
| Period ended | 30 Sep 2025 | 31 Mar 2025 | 31 Mar 2024 | 31 Mar 2023 |
|---|---|---|---|---|
| Assets | 546.51 | 303.32 | 102.40 | 42.83 |
| Total Income | 275.76 | 302.77 | 133.76 | 73.09 |
| Profit After Tax | 40.44 | 30.80 | 7.69 | 0.85 |
| Net Worth | 119.32 | 78.88 | 12.24 | 4.56 |
| Reserve & Surplus | 116.18 | 75.74 | 10.24 | 2.56 |
| Total Borrowings | 312.08 | 128.25 | 64.52 | 28.26 |
₹ in crore, as stated in the prospectus.
Key performance indicators
| KPI | 30 Sep 2025 | 31 Mar 2025 | 31 Mar 2024 | 31 Mar 2023 |
|---|---|---|---|---|
| ROE % | 40.81 | 67.61 | 91.53 | 20.54 |
| ROCE % | 20.86 | 37.19 | 30.57 | 12.93 |
| Debt / Equity | 2.65 | 1.63 | 5.27 | 6.20 |
| RoNW % | 33.90 | 39.05 | 62.81 | 18.61 |
| Pat Margin % | 14.67 | 10.17 | 5.75 | 1.16 |
Peer comparison
| Company | Face value | P/E | EPS (basic) | EPS (diluted) | RoNW | NAV |
|---|---|---|---|---|---|---|
| Sadbhav Futuretech Ltd | 2 | — | 4.36 | 4.36 | 39.05% | 8.38 |
| Group GK Energy Ltd | 2 | 14.17 | 7.86 | 7.86 | 63.71% | 12.29 |
| Shakti Pumps (India) Ltd | 10 | 15.17 | 33.97 | 33.97 | 35.17% | 96.59 |
| Oswal Pumps Ltd | 1 | 11.20 | 28.21 | 28.18 | 60.69% | 46.48 |
Notes
Basic EPS and Diluted EPS is sourced from the restated consolidated financial statements of the respective company for the Fiscal ended March 31, 2025.
P/E Ratio has been computed based on the closing market price of equity shares on NSE on February 27, 2026 divided by the Basic/Diluted EPS provided.Return on Net Worth for equity shareholders (%) (RONW) = Profit for the year attributable to the equity shareholders of the respective company for the Fiscal 2025 divided by total net worth as at March 31, 2025.
Net Asset Value per share is computed as the Total Equity of the Company as on March 31,2025 divided by the outstanding number of Equity shares as on March 31, 2025 as adjusted for the effect of split and bonus.
Revenue from Operations has been derived from the restated consolidated financial statements of the respective company for the Fiscal ended March 31, 2025.
From the prospectus. P/E is shown as — when earnings are zero or negative, or not reported for the issuer before listing.
Objectives
The company intends to allocate the net proceeds from the offering to the following objectives.
| Sr | Objective | Est Amt (₹ Cr.) |
|---|---|---|
| 1 | Funding working capital requirements of our Company | 215.00 |
| 2 | General corporate purposes | — |
| Total | 215 |
About Sadbhav Futuretech Limited
Incorporated in 2020, Sadbhav Futuretech Limited is engaged in the engineering, procurement, and construction (EPC) of solar power projects, with a primary focus on solar water pumping systems, rooftop solar installations, and ground-mounted solar projects.
During the stub period and the last three financial years, the company installed a cumulative capacity of 171.68 MW, comprising 171.53 MW of solar water pumping systems and 0.15 MW of rooftop solar capacity. It has also secured one EPC contract and received two letters of intent for ground-mounted solar projects with a combined capacity of 120.00 MW.
The company's customer base includes central and state government agencies, as well as private sector clients such as Rotomag Enertec Limited, Siddhakala Renewable Energy System Private Limited, Dynamech Electropower Private Limited, Premier Energies Limited, and KSL Cleantech Limited.
Sadbhav Futuretech follows an in-house execution model covering project management, design, engineering, and procurement, while sourcing solar modules, cells, inverters, and other components through third-party vendors.
As of February 28, 2026, the company's order book stood at ₹2,01,605.00 lakh, comprising ₹87,553.52 lakh from solar water pumping projects, ₹79,051.48 lakh from rooftop solar projects, and ₹35,000.00 lakh from ground-mounted solar projects across 19 projects. Of this amount, revenue of ₹58,587.79 lakh had been recognised up to September 30, 2025.
The company operates across several states, including Maharashtra, Assam, Andhra Pradesh, Madhya Pradesh, Rajasthan, Haryana, and Chhattisgarh. Its operations are supported by 11 warehouses and six regional offices, with a significant presence in Andhra Pradesh, Assam, and Maharashtra.
Its product portfolio includes DC and AC submersible and surface pumps with capacities ranging from 3 HP to 10 HP. As of February 28, 2026, Sadbhav Futuretech Limited, together with its subsidiaries, had a total workforce of 104 employees, including 56 employees engaged in operations.
Promoters
Bhupender Singh
Saikat Roy
Bettericon Consultancy Private Limited
Nilesh Jain
Neelam Jain
Samkit Jain
Contact details
Sadbhav Futuretech Ltd.
Q.No. C-74, HIG,
Shailendra Nagar
Raipur, Chhattisgarh, 492001
Telephone: + 91 7419022261
Email: corporate.cs@sadbhavfuturetech.com
Website:https://sadbhavfuturetech.com/
Sadbhav Futuretech IPO FAQs
- Has Sadbhav Futuretech IPO filed for an IPO?
- Sadbhav Futuretech Limited filed its draft red herring prospectus (DRHP) with SEBI on 2 Apr 2026.
- When will the Sadbhav Futuretech IPO open?
- Issue dates are announced after SEBI observations and the RHP filing. They are not available yet.
- What is the Sadbhav Futuretech IPO price band?
- The price band is announced a few days before the issue opens. It is not available yet.
Details are from the draft prospectus and can change in the final RHP. This is not investment advice.