Skip to content
SME BSE Listed
Accord Transformer & Switchgear Limited logo

Accord Transformer & Switchgear IPO: Price Band, Lot Size, Financials & Review

Accord Transformer & Switchgear IPO listed on BSE on Mon, 2 Mar 2026. The issue was subscribed 401.38x overall.

Open Date
23 Feb 2026
Close Date
25 Feb 2026

Last updated

Price band
₹43 – ₹46
Lot size
3,000 shares
Min. investment
₹2,76,000
Issue size
₹26 Cr
Last GMP
+₹4
Subscribed
🔥 401.38x

Accord Transformer & Switchgear IPO details

Accord Transformer & Switchgear IPO is a ₹26 Cr book-building IPO on the SME segment, listing on BSE.

The issue was open from Mon, 23 Feb 2026 to Wed, 25 Feb 2026. Allotment was finalised on Thu, 26 Feb 2026, and the shares listed on BSE on Mon, 2 Mar 2026.

The price band is ₹43 to ₹46 per share and the lot size is 3000 shares, so the minimum retail application is ₹2,76,000. Retail investors can apply for up to 2 lots (6,000 shares, ₹2,76,000).

KFin Technologies Limited is the registrar, and GYR Capital Advisors Private Limited is the book running lead manager.

Grey market premium (GMP)

Day-wise GMP →

The last Accord Transformer & Switchgear IPO GMP before listing was +₹4 (+8.70% against the upper price band of ₹46), implying an estimated listing price of ₹50. Across 10 days of tracking, GMP ranged from +₹4 (27 Feb) to +₹17 (21 Feb).

Last GMP +₹4
GMP vs upper band +8.70%
Estimated listing price ₹50
Highest (21 Feb) +₹17
Lowest (27 Feb) +₹4

Grey market trading is unofficial and unregulated. GMP is a sentiment indicator, not a guarantee of the listing price. See the Accord Transformer & Switchgear IPO day-wise GMP.

Accord Transformer & Switchgear IPO was subscribed 401.38x overall: QIB 153.01x, NII 606.38x and retail 367.59x.

Category Subscribed
QIB 153.01x
NII 606.38x
└ bNII (above ₹10 lakh) 710.22x
└ sNII (₹2–10 lakh) 398.70x
Retail 367.59x
Total 401.38x

Final figures at the close of bidding on 25 Feb 2026. Category-wise bids, application-wise breakup and allotment chances are on the Accord Transformer & Switchgear IPO day-wise and category-wise subscription page.

Share reservation by category

Category Shares offered Share of issue
Qualified Institutions 10,56,000 28.57%
Non-Institutional 7,92,000 21.43%
└ BNII 5,28,000 14.29%
└ SNII 2,64,000 7.14%
Retail Investors 18,48,000 50.00%
Total 36,96,000 100.00%

Accord Transformer & Switchgear IPO lot size

Application Lots Shares Amount
Retail (Min) 2 6,000 ₹2,76,000
Retail (Max) 2 6,000 ₹2,76,000
S-HNI (Min) 3 9,000 ₹4,14,000
S-HNI (Max) 7 21,000 ₹9,66,000
B-HNI (Min) 8 24,000 ₹11,04,000

Amounts at the upper end of the price band.

Issue structure and valuation

At the upper price band of ₹46, the issue is priced at 11.41x pre-issue earnings and 15.63x post-issue earnings per share.

The post-issue P/E is higher because the fresh issue adds new shares, which spreads the same profit over more shares.

Listed peers with positive earnings trade at a median P/E of 24.76x (3 companies).

Promoter holding falls from 84.94% before the issue to 61.98% after it.

EPS (pre-issue) Latest earnings per share before the issue ₹4.03
P/E (pre-issue) Upper price band ÷ pre-issue EPS 11.41x
EPS (post-issue) EPS on the enlarged share capital ₹2.94
P/E (post-issue) Upper price band ÷ post-issue EPS 15.63x
Promoter holding (pre-issue) 84.94%
Promoter holding (post-issue) 61.98%

Accord Transformer & Switchgear Limited financials

Between 31 Mar 2024 and 31 Mar 2025, Income rose from ₹48.6 Cr to ₹79.2 Cr, and profit after tax rose from ₹1.61 Cr to ₹6.05 Cr. The PAT margin for 31 Mar 2025 was 7.64%.

Period ended 31 Dec 2025 31 Mar 2025 31 Mar 2024 31 Mar 2023
Assets 41.02 59.89 26.46 15.82
Total Income 45.29 79.20 48.60 40.81
Profit After Tax 2.91 6.05 1.61 0.87
Net Worth 24.45 21.54 6.04 4.43
Reserve & Surplus 9.44 21.25 5.79 4.18
Total Borrowings 4.37 11.81 9.13 2.30

₹ in crore, as stated in the prospectus.

Key performance indicators

KPI Dec 2025 Mar 2025 Mar 2024 Mar 2023
ROE % 12.67 43.90 30.69 21.99
ROCE % 14.52 26.00 16.47 20.49
Debt / Equity 0.18 0.55 1.51 0.52
RoNW % 11.91 28.10 26.60 19.81
Pat Margin % 6.44 7.66 3.31 2.15

Peer comparison

Company Face value P/E EPS (basic) EPS (diluted) RoNW NAV
Accord Transformer & Switchgear Ltd 10 — 4.35 4.35 28.10% 14.35
Danish Power Ltd 10 18.09 34.55 34.55 18.00% 162.50
Transformers and Rectifiers (India) Ltd 1 34.43 7.21 7.21 17.01% 42.39
Voltamp Transformers Ltd 10 24.76 321.65 321.65 20.50% 1,569.24

From the prospectus. P/E is shown as — when earnings are zero or negative, or not reported for the issuer before listing.

Objectives

The company intends to allocate the net proceeds from the offering to the following objectives.

Sr Objective
1 Capital expenditure towards purchase of Machinery and equipment
2 Funding of the working capital requirement of our Company
3 General corporate purposes

About Accord Transformer & Switchgear Limited

Accord Transformer & Switchgear Ltd., incorporated in 2014, is a well-established engineering company specializing in the design, manufacturing, and supply of a wide range of electrical power and distribution equipment. With over a decade of industry experience, the company serves both standard and custom requirements across diverse sectors, including power transmission and distribution, renewable energy, industrial applications, infrastructure development, and electric vehicle (EV) charging networks.

Product Portfolio

1. Transformers

Accord Transformer & Switchgear Ltd. offers an extensive range of transformers designed for varied applications:

  • Distribution Transformers: Up to 2.5 MVA, 36 kV
  • Power Transformers: Up to 20 MVA, 33 kV
  • Dry-Type Transformers: Up to 5000 KVA, 36 kV
  • Special-Purpose Transformers:
    • Solar inverter duty transformers
    • Wind inverter duty transformers
    • Furnace duty transformers
    • Other application-specific transformer solutions

2. Control Panels & Switchgear

The company manufactures and supplies a complete range of control panels and switchgear solutions, including:

  • Low-Voltage (LV) Panels: LV control panels, LV switchboards, and APFC panels
  • Medium-Voltage (MV) Panels: VCB (Vacuum Circuit Breaker) panels and associated MV solutions
  • Industrial Control Panels
  • Customised Prisma Set Control Panels (developed in collaboration with Schneider Electric)
  • Package Substations, Busducts, Cable Trays, and integrated switchgear assemblies

Manufacturing Infrastructure

Accord operates two state-of-the-art manufacturing facilities in Bhiwadi, Rajasthan, supported by a registered office in Manesar, Haryana. The facilities are equipped with modern machinery and advanced systems, including:

  • Plasma cutting machines
  • Foil winding machines
  • Shot blasting and painting booths
  • Fully equipped in-house testing laboratories

This infrastructure enables the company to successfully design, manufacture, test, and deploy critical power system solutions with high reliability and technical precision.

Workforce

As of August 31, 2025, Accord Transformer & Switchgear Ltd. employed 117 permanent personnel, comprising skilled engineers, technicians, and support staff.

Promoters

  1. Mr. Pradeep Kumar Verma
  2. Mrs Shalini Singh 

Contact details

Accord Transformer & Switchgear Ltd.
Unit No. 724, Seventh Floor
Eros Corporate Park, K Block, Sector 2
IMT Manesar, Manesar
Gurgaon, Haryana, 122052
Phone: +91 85274 22944
Email: compliance@atsgroup.in
Website: https://atsgroup.in/

Accord Transformer & Switchgear IPO FAQs

What is the Accord Transformer & Switchgear IPO price band?
The Accord Transformer & Switchgear IPO price band is ₹43 to ₹46 per share.
What is the Accord Transformer & Switchgear IPO lot size and minimum investment?
The Accord Transformer & Switchgear IPO lot size is 3000 shares. The minimum retail investment is ₹2,76,000 for one lot at the upper price band. Retail investors can apply for up to 2 lots (6,000 shares), costing ₹2,76,000.
When was Accord Transformer & Switchgear IPO open for subscription?
Accord Transformer & Switchgear IPO was open for subscription from Mon, 23 Feb 2026 to Wed, 25 Feb 2026.
What is the Accord Transformer & Switchgear IPO subscription status?
Accord Transformer & Switchgear IPO was subscribed 401.38x overall: QIB 153.01x, NII 606.38x and retail 367.59x. Day-wise and category-wise figures are on the subscription page.
What was the Accord Transformer & Switchgear IPO GMP before listing?
The last Accord Transformer & Switchgear IPO GMP before listing was +₹4 (+8.70% against the upper price band of ₹46), implying an estimated listing price of ₹50. Across 10 days of tracking, GMP ranged from +₹4 (27 Feb) to +₹17 (21 Feb). GMP is an unofficial grey market indicator and can change quickly.
What is the Accord Transformer & Switchgear IPO allotment date?
The Accord Transformer & Switchgear IPO basis of allotment was finalised on Thu, 26 Feb 2026. You can check your allotment status on the KFin Technologies Limited website.
What is the Accord Transformer & Switchgear IPO listing date?
Accord Transformer & Switchgear IPO listed on BSE on Mon, 2 Mar 2026.
Who are the registrar and lead managers of the Accord Transformer & Switchgear IPO?
The registrar for the Accord Transformer & Switchgear IPO is KFin Technologies Limited, and the book running lead manager is GYR Capital Advisors Private Limited.

Data is compiled from the prospectus, stock exchanges and market sources and is for information only. It is not investment advice; read the RHP before applying.