Teja Engineering Industries IPO Subscription Status
Teja Engineering Industries IPO received bids for 18,00,600 shares against 16,12,800 offered, an overall subscription of 1.12x at the close of bidding (2 Jul 2026). NII leads at 1.30x, while QIB (0.00x) and Retail (0.32x) portions are undersubscribed.
Last updated · day 3 figures
- Retail
- 0.32x
- NII
- 1.30x
- QIB
- 0.00x
- Total
- 1.12x
Teja Engineering Industries IPO allotment chances
Approximate · day 3- Retail / Individual 0.32x
- 1 in 1 Fewer applications than lots
- Based on applications vs lots
Where the demand is
Teja Engineering Industries IPO subscription by category
| Category | Shares offered | Shares bid | Amount bid | Subscription |
|---|---|---|---|---|
| QIB | 0 | 5,00,400 | ₹11.01 Cr | 0.00x |
| NII | 8,06,400 | 10,44,600 | ₹22.98 Cr | 1.30x |
| Retail | 8,06,400 | 2,55,600 | ₹5.62 Cr | 0.32x |
| Total | 16,12,800 | 18,00,600 | ₹39.61 Cr | 1.12x |
* Shares Offered and Total Amount are calculated based on the upper price of the issue price range. * The portion of anchor investors (or market makers) is not included in the total number of shares offered.
Application-wise breakup and allotment chances
| Category | Lots reserved | Applications | Applied | Chance per application |
|---|---|---|---|---|
| QIB | — | 2 | — | — |
| NII | 448 | 58 | 0.13x | 1 in 1 |
| Retail | 672 | 213 | 0.32x | 1 in 1 |
"All valid" means applications are fewer than the lots reserved, so every valid application should get at least one lot. When applications exceed lots, allottees are picked by computerised lottery and "1 in X" is the rough chance for one application. The real chance is usually a little better: bids below the cut-off price and invalid applications are removed before the lottery.
Teja Engineering Industries IPO subscription day-wise
| Category | Day 3 |
|---|---|
| QIB | 0.00x |
| NII | 1.30x |
| Retail | 0.32x |
| Total | 1.12x |
| Total added | 1.12x |
Cumulative figures at the end of each day. Read across a row to see how demand built up. Shading deepens as subscription rises above 1x; "Total added" is how much overall subscription grew that day.
Teja Engineering Industries IPO reservation
| Category | Shares | Share of issue |
|---|---|---|
| Non-Institutional Investors | 8,06,400 | 50.00% |
| Retail Individual Investors | 8,06,400 | 50.00% |
| Public issue | 16,12,800 | 100% |
Allotment Chances Note
These are estimates from the latest application and subscription figures. Actual chances are usually somewhat better, because:
- Not every bid is at the cut-off price. Bids below the final issue price are rejected before the lottery, so fewer applications compete.
- Multiple-lot applications count once. In an oversubscribed retail or sNII portion, each application gets at most one minimum lot in the draw, however many lots it bid for.
- Invalid applications drop out. Unapproved UPI mandates, PAN mismatches and duplicate applications are removed before allotment.
Applying for more lots in the retail category does not improve your odds; applying from separate family accounts does.
Teja Engineering Industries IPO subscription: FAQs
- What is the overall subscription of Teja Engineering Industries IPO?
- Teja Engineering Industries IPO is subscribed 1.12x overall as of day 3 (2 July 2026), with bids for 18,00,600 shares against 16,12,800 offered.
- What is the retail subscription of Teja Engineering Industries IPO?
- The retail portion is subscribed 0.32x as of day 3 (2 July 2026). 213 retail applications have been received for 672 lots available.
- What is the QIB and NII subscription of Teja Engineering Industries IPO?
- QIBs have subscribed 0.00x of their portion, and NIIs 1.30x as of day 3 (2 July 2026).
- What are the chances of getting Teja Engineering Industries IPO allotment?
- Retail applications are below the number of lots available, so every valid retail application is likely to receive at least one lot.
- How can I check Teja Engineering Industries IPO subscription status live?
- This page shows category-wise and day-wise figures and is updated during bidding hours. The same data is published on the BSE and NSE websites under the issue name.
- How do I apply for Teja Engineering Industries IPO?
- Apply online through your broker or bank using UPI or ASBA. Choose the IPO, enter the number of lots and bid price (retail investors can bid at the cut-off price), and approve the UPI mandate before the issue closes on 2 July 2026.
Subscription figures are compiled from BSE and NSE bid data and can be revised by the exchanges after the issue closes. For information only; not investment advice.