Skip to content
SME BSE Bidding closed

Goel Construction IPO Subscription Status

Goel Construction IPO received bids for 31,78,17,600 shares against 24,82,000 offered, an overall subscription of 128.05x at the close of bidding (4 Sep 2025). NII leads at 225.16x.

Last updated · day 3 figures

Retail
88.55x
NII
225.16x
QIB
124.20x
Total
128.05x

Where the demand is

Goel Construction IPO subscription by category Each line starts at 1x (fully subscribed) and ends at the category's subscription multiple, on a logarithmic scale. Values are listed in the table below. 0.1x 1x 10x 100x 1,000x QIB QIB: 124.20x 124.20x NII NII: 225.16x 225.16x Retail Retail: 88.55x 88.55x Total Total: 128.05x 128.05x
Log scale. Lines run from 1x (fully subscribed): right means more demand than shares, left means shares still unbid.

Goel Construction IPO subscription by category

Category Shares offered Shares bid Amount bid Subscription
QIB 7,08,400 8,79,82,000 ₹2,313.93 Cr 124.20x
NII 5,32,800 11,99,63,600 ₹3,155.04 Cr 225.16x
Retail 12,40,800 10,98,72,000 ₹2,889.63 Cr 88.55x
Total 24,82,000 31,78,17,600 ₹8,358.60 Cr 128.05x

* Shares Offered and Total Amount are calculated based on the upper price of the issue price range. * The portion of anchor investors (or market makers) is not included in the total number of shares offered.

Application-wise breakup and allotment chances

Category Lots reserved Applications Applied Chance per application
QIB — 141 — —
NII — 38,973 — —
Retail — 1,37,340 — —

"All valid" means applications are fewer than the lots reserved, so every valid application should get at least one lot. When applications exceed lots, allottees are picked by computerised lottery and "1 in X" is the rough chance for one application. The real chance is usually a little better: bids below the cut-off price and invalid applications are removed before the lottery.

Goel Construction IPO subscription day-wise

Category Day 3
QIB 124.20x
NII 225.16x
Retail 88.55x
Total 128.05x
Total added 128.05x

Cumulative figures at the end of each day. Read across a row to see how demand built up. Shading deepens as subscription rises above 1x; "Total added" is how much overall subscription grew that day.

Goel Construction IPO reservation

Category Shares Share of issue
Qualified Institutional Buyers 7,08,400 28.54%
Non-Institutional Investors 5,32,800 21.47%
Retail Individual Investors 12,40,800 49.99%
Public issue 24,82,000 100%

Allotment Chances Note

These are estimates from the latest application and subscription figures. Actual chances are usually somewhat better, because:

  • Not every bid is at the cut-off price. Bids below the final issue price are rejected before the lottery, so fewer applications compete.
  • Multiple-lot applications count once. In an oversubscribed retail or sNII portion, each application gets at most one minimum lot in the draw, however many lots it bid for.
  • Invalid applications drop out. Unapproved UPI mandates, PAN mismatches and duplicate applications are removed before allotment.

Applying for more lots in the retail category does not improve your odds; applying from separate family accounts does.

Goel Construction IPO subscription: FAQs

What is the overall subscription of Goel Construction IPO?
Goel Construction IPO is subscribed 128.05x overall as of day 3 (4 September 2025), with bids for 31,78,17,600 shares against 24,82,000 offered.
What is the retail subscription of Goel Construction IPO?
The retail portion is subscribed 88.55x as of day 3 (4 September 2025).
What is the QIB and NII subscription of Goel Construction IPO?
QIBs have subscribed 124.20x of their portion, and NIIs 225.16x as of day 3 (4 September 2025).
How can I check Goel Construction IPO subscription status live?
This page shows category-wise and day-wise figures and is updated during bidding hours. The same data is published on the BSE and NSE websites under the issue name.
How do I apply for Goel Construction IPO?
Apply online through your broker or bank using UPI or ASBA. Choose the IPO, enter the number of lots and bid price (retail investors can bid at the cut-off price), and approve the UPI mandate before the issue closes on 4 September 2025.

Subscription figures are compiled from BSE and NSE bid data and can be revised by the exchanges after the issue closes. For information only; not investment advice.